Conference center upgraded, open house scheduled

Brandon Meyers (left), lead project manager, CCS Presentation Systems, describes some of the various features of the audio visual system in the Hanscom Conference Center’s Lexington Amphitheater control center to Donn DeSilva (center), 66th Communications and Information Division information technology help desk specialist, and Patrick Libby, network engineer, communications division, during a training session at the conference center Dec. 30. The center’s two largest conference rooms, the Concord Room and Lexington Amphitheater, were recently upgraded to meet current industry standards. (U.S. Air Force photo by Jerry Saslav)

PHOTO BY: Jerry Saslav
VIRIN: 141230-F-RK751-034.JPG
FULL SIZE: 3.38 MB
Additional Details

No camera details available.

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.