Conference center upgraded, open house scheduled
Brandon Meyers (left), lead project manager, CCS Presentation Systems, describes some of the various features of the audio visual system in the Hanscom Conference Center’s Lexington Amphitheater control center to Donn DeSilva (center), 66th Communications and Information Division information technology help desk specialist, and Patrick Libby, network engineer, communications division, during a training session at the conference center Dec. 30. The center’s two largest conference rooms, the Concord Room and Lexington Amphitheater, were recently upgraded to meet current industry standards. (U.S. Air Force photo by Jerry Saslav)
PHOTO BY:
Jerry Saslav
VIRIN:
141230-F-RK751-034.JPG
FULL SIZE:
3.38 MB
CAMERA
N/A
LENS
N/A
APERTURE
N/A
No camera details available.
IMAGE IS PUBLIC DOMAIN
Read More
This photograph is considered public domain and has been cleared for release.
If you would like to republish please give the photographer appropriate credit.
Further, any commercial or non-commercial use of this photograph or any other
DoD image must be made in compliance with guidance found at
https://www.dimoc.mil/resources/limitations,
which pertains to intellectual property restrictions (e.g., copyright and
trademark, including the use of official emblems, insignia, names and slogans), warnings
regarding use of images of identifiable personnel, appearance of endorsement, and related matters.